Design and Supervision Consultant (DSC) for Feasibility Study, Detailed Engineering Design and Construction Supervision of Small Town Water Supply and Sanitation Sector Project in Sukhad, Rukum, Sitalpati – Salyan and Chandrauta Municipality Town Water Su

Narrative Description of Project:

Government of Nepal has received a financial assistance of ADB for implementation of Small Towns Water Supply and Sanitation Sector Project. The project aims to improve health and quality of life of the people in 20-25 small towns by constructing or extending water supply, drainage and sanitation facilities and providing health and hygiene education program.

Main Project Features:

Sukhad (Ghodaghodi Municipality) - Kailali Population – 16056; Household – 2377; Design Discharge – 39 lps; Ground Water / Pumpimg (Lifting) / Deep Tubewell – 5 nos, Pump – 5 sets; Overhead Tank-2 no of 200 m3; Water Treatment Plant; Pressure Filter of 360 m3/hr; Distribution Network-65.6 Km (DI, GI and HDPE); Office Building – 2; Sanitation 3 Institutional Toilet; Construction Cost (approx): NRs. 233 millions.

Musikot Municipality - Rukum Population – 18741; Household – 2468; Design Discharge – 28 lps; Transmission Pipeline -14.3Km (GI and HDPE); Distribution – 29.8 Km (DI, GI and HDPE); Treat Slow Sand Filter with provision of Chlorine Contract Tank for capacity of 32m3/hr and 76m3/hr; Office Building – 1; Sanitation-3 Institutional Toilet; Construction Cost (approx): NRs. 186 millions.

Sitalpati / Salyan (Sharada Municipality) Population – 14779; Household – 1256, Design Discharge – 16.73 lps; Ground Water / Pumpimg (Lifting) / Deep Tubewell – 2 no Shallow Well, Pump – 6 sets, Transmission Pipeline-5Km; Treatment Plant-2 sets of 72m3/hr capacity each pressure filters with water softening through zeolite process with total of 144m3/hr capacity; Distribution Network – 17.5 Km (DI, GI, HDPE); Office Building – 1; Sanitation – 1 Institutional Toilet; Construction Cost (approx): NRs. 165 millions.

Chandrauta (Krishnanagar Municipality) - Kapilvastu Population – 17346; Household – 2468; Design Discharge – 26 lps; Ground Water / Pumpimg (Lifting) / Deep Tubewell – 2 no, Pump – 4 sets; Treatment Facility-2 sets of 72m3/hr capacity each Pressure Filters with total of 144m3/hr capacity; Distribution Network 29.28 Km (DI, GI and HDPE); Office Building – 1, Sanitation 1 Institutional Toilet, Construction Cost (approx): NRs. 146 millions.

 

Description of Actual Services Provided in the Assignment:

  1. Feasibility Study (Sukhad, Rukum, Sitalpati and Chandrauta):
  2. Detailed Engineering Design Phase (Sukhad, Rukum, Sitalpati and Chandrauta):
  3. Construction Supervision and Management (Sukhad, Sitalpati and Rukum):
  1. Scoping and Preparation of Project Documents for Additional Financing (Loan No. 3157 NEP SF)
  2. Benefit Monitoring and Evaluation (BME) and Preparation of Report in Five Towns Projects (Indrapur, Karahiya Makrahar, Baglung, Lamahi and Byas Municipality 
  3. Trainings